The time has come to completely rework our kitchen. This will involve in this order, but that could change.


  1. Rip up floor tiles.
  2. Repair/replace the hole in the ceiling where the sky light was. 
  3. Remove the sliding door and frame.
  4. Remove all of the existing benches, sinks, cupboards, stove and cook top.
  5. Remove exhaust fan and replace that section of ceiling.
  6. Get contractor to put in new gas pipe for the new gas hob. 
  7. Get contractor to put in new power point for the microwave. 
  8. Repaint all walls and ceilings. 
  9. Install new cupboards and benches.
  10. Buy new stove, range-hood, dishwasher, microwave.
  11. Get the custom bench top measured and fitted.
  12. Install electrical appliances. 
  13. Rip up the tiles in the passage way, and pull up the carpets in the dining and family rooms.
  14. Lay new floor tiles in all of those rooms.
  15. Take care of anything else that pops up along the way.

Once that has been completed we will knock the bar down in the lounge room and convert the alcove  behind the bar into a cupboard to store the DVD player and the DVD's we have.

Please check back every now and then to check our progress.

Andrew

Wednesday, November 4, 2009

The tiles are removed from the floor.

The first tile is broken.

 

Another view of the first day.

 

A few more done but it's very hard work.

 

Cleaning up after the first day.

 

It is so hard going.

 

This bench is going and those tiles.

 

I went out and bought a power tool to help and it is so much better now.

 

I only have the tiles under the fridge to remove and the floor is all done.

I have to clean up the rest of the tile cement.

 

 